Thursday 18 November 2010

The Frame

The frame has finally arrived so we can begin the build of the rolling chassis. For your information the frame was built by Lucas and the cool guys at The Factory Metal Works (www.thefactorymetalworks.com) over in Charlotte, North Carolina. It features a 4" stretch and an increased rake of 32 degrees for high speed stability.